PROJECTS    COMMERCIAL    CITY CREEK CENTER CASCADE BUILDING
City Creek Center Cascade Building
Salt Lake City, UT, UT
Project Description

This project was originally designed as a 107-unit condominium building with street level retail and below grade parking. However, this full design was never realized during initial construction due to market conditions. The final scope in the GMP contract was to build just the three stories above grade retail in a core & shell condition, built to accomodate the condominium tower above when approved. The building structure is comprised of an augercast piling deep foundation system below a 12-foot thick mat foundation. The cast-in-place concrete structure has mild reinforced substructure decks and post-tensioned superstructure decks. The exterior cladding is all glass and metal panel with some limestone tiles in arriscraft frame on accent elevations.

What Our Clients Are Saying

Architect
Zimmer Gunsul Frasca Architects, LLP
Owner
City Creek Reserve, Inc.
Project Size
99,460sf
Date Completed
April 2010
Sustainability
LEED Gold
Share
           
Location
City Creek Center Cascade Building
50 W. 100 S.
Salt Lake City, UT, Utah 84101



Other Related Projects

America First Credit Union - Draper Branch
america-first-credit-union-draper-branch
commercial

America First Credit Union - Jordan Landing
america-first-credit-union-jordan-landing
commercial

City Creek Center Underground Parking
city-creek-center-underground-parking
commercial

The Gateway Mixed-Use Development
the-gateway-mixed-use-development
commercial